Contemplating obtaining a set of long bolts for lowering the subframe (sump change needed) but unsure how to use them.
Do they bolt all the way up and are then progressively slackened to lower subframe to required height, does the subframe have to be held up (jack etc) the bolts inserted then the subframe lowered to suit the bolts' length, or some other arrangement?
Any advice welcome. TIA.
Do they bolt all the way up and are then progressively slackened to lower subframe to required height, does the subframe have to be held up (jack etc) the bolts inserted then the subframe lowered to suit the bolts' length, or some other arrangement?
Any advice welcome. TIA.
Comment